MINIMIZE WASTE MOTION IN THE PRODUCTION PROCESS LAYOUT
Downloads
This study aims to determine the factors that cause waste motion and provide a proposed improvement and improvement design to minimize the factors that cause waste motion in the production process of UD Putera Sroedji Jember. UD Putera Sroedji is a medium-scale company in the field of rice production in the Jember area. The problems found at UD Putera Sroedji are the production flow that is not suitable in general and the distance between departments is quite far. These two things are one of the causes of the company's waste motion. The data was obtained by making observations to observe the flow of the production process as well as measuring distance and time. Data analysis used ARC, ARD and Kaizen methods. The results show that the efficiency level given from the two production process lines, namely the proposed layout will be estimated to be able to reduce the production distance of line 1 along 31.25 meters or more efficiently by 30.65% with time savings of 2.828.75 seconds. 2 along 45.4 m or more efficient by 38.07% with a time saving of 3,980.15 seconds.
Copyright (c) 2023 Fenza Gusti Naufal Paleva, Eka Bambang Gusminto, Fiona Niska Dinda Nadia, Ariwan Joko Nusbantoro, Rasyidi Faiz Akbar
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
ADJ by Unair is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
1. The journal allows the author(s) to hold the copyright of the article without restrictions.
2. The journal allows the author(s) to retain publishing rights without restrictions
3. The legal formal aspect of journal publication accessibility refers to Creative Commons Attribution-ShareAlike 4.0 International License