IRSAN; UTAMA, M.; NURLIYANTIKA, R.; SAPUTRA, R.; IDRIS, A. Drafting Extension of Time for Completion to Avoid Time at Large in Construction Contract. Notaire, [S. l.], v. 7, n. 2, p. 247–266, 2024. DOI: 10.20473/ntr.v7i2.58379. Disponível em: https://e-journal.unair.ac.id/NTR/article/view/58379. Acesso em: 12 aug. 2024.