1.
Irsan, Utama M, Nurliyantika R, Saputra R, Idris A. Drafting Extension of Time for Completion to Avoid Time at Large in Construction Contract. Ntr [Internet]. 2024 Jun. 28 [cited 2024 Aug. 12];7(2):247-66. Available from: https://e-journal.unair.ac.id/NTR/article/view/58379