[1]
Lestari, Y.D. and Adhirajasa, A.R. 2024. Implementation of Lean Construction to Reduce Waste with the Value Stream Analysis Tools (VALSAT) Method in the Project Casting Process. Southeast Asian Business Review. 2, 2 (Aug. 2024), 92–110. DOI:https://doi.org/10.20473/sabr.v2i2.62011.